The sheetrock is finally all removed, leaving the entire ground floor open into the garage. Thank goodness the temperatures have been moderate - with a springlike 65 today. Today I painted Drylok on the exposed concrete block. Most of the moisture left was coming from the outside, not a result of the flooding inside. Hopefully the paint will block some of that. The big news is that we have decided to hire someone to do the sheetrock/taping/spackling. The job was just getting too big and this crew is doing a lot of the work in neighboring units and seems to be good. Now I just need a call back from them to schedule the work and then we should be able to relax for a while. We'll still install the ceramic tile floor in the entertainment room and do the painting.